Start with the agreed configuration
Bring the latest approved drawing and the order's configuration list. Match each bay, roof type, control group, enclosure and supplied accessory to the installed arrangement. Record any agreed site changes on the handover copy so later service work uses the correct information.
The pre-shipment inspection checks the supplied order before dispatch. Site handover checks the assembled installation and its agreed local scope. Neither replaces the other. Keep foundation, electrical and other required local documentation with the project file.
Ask for a normal-use demonstration
Have the installer demonstrate opening, closing, stopping and the assigned controls under the product's operating instructions. Identify which control operates each bay. With JY280, observe the folding and retraction sequence; with rotating-louver models, observe blade rotation. Keep people and objects outside moving parts.
Ask for the procedure for a power cut, unusual noise or a fault. Do not assume manual operation is available, force the mechanism or open electrical components. For installed weather sensors, request the actual settings, response priorities and a demonstration allowed by the manual. Wind, rain and frost responses are not interchangeable across systems.
Review drainage and moving accessories
Ask the installer to identify gutters, discharge points and cleaning access. Any agreed water-flow check should follow the applicable installation procedure and be recorded with its conditions. A demonstration does not establish performance in every storm, and roof discharge should be considered together with site drainage.
Operate supplied glass and ZIP screens through their permitted travel. Check access routes and look for contact between moving components. If, for example, a screen interferes with a door, record the location and operating position, assign the issue for correction and avoid the affected operation until resolved. Do not improvise a fixing change.
Keep a short, usable handover record
Use one record with a status, evidence and responsible contact for each item. Mark items as demonstrated, pending or outside the agreed scope rather than leaving blank boxes.
| Check | Evidence to keep |
|---|---|
| Configuration and revisions | Approved layout, agreed changes and identification of each bay. |
| Roof and accessory operation | Installer's demonstration record and any unresolved interference. |
| Drainage | Discharge locations, maintenance access and conditions of any flow check. |
| Controls and instructions | Controller identification, supplied manuals and applicable sensor settings. |
| Documents and support | Warranty terms, component references and supplier/installer service contacts. |
| Outstanding work | Description, photo where useful, responsible party and agreed follow-up. |
Make the next service call straightforward
Collect the operating instructions for the roof and each separately supplied accessory, maintenance requirements, warranty scope and the contact responsible for local labour. Ask how to report a fault and what order or component references to include. Do not assume one warranty covers products supplied by different companies.
Agree the handover requirements when preparing the order. The installation preparation guide covers readiness before assembly; the electrical planning guide helps define the control and power scope. For a folding roof, also confirm the opening and stacking layout.
Buyer questions
Does a working roof prove the installation meets local requirements?
No. A functional demonstration does not verify structural design, supporting construction, electrical compliance or required approvals. Keep the relevant evidence from the responsible qualified parties.
Should every pergola have weather sensors?
Only check against the equipment actually agreed and supplied. If sensors are included, obtain their instructions and settings; do not assume a sensor or automatic protection is standard.
What if an item is unfinished at handover?
Record the issue, affected function, responsible party and next action. Follow the installer's instructions about any use restrictions. Do not mark an unresolved item as complete merely because the rest of the installation operates.
This is a buyer's coordination checklist, not an installation manual, legal acceptance document or engineering certificate. Product-specific procedures and local requirements still apply.
Include handover in your project brief
Share the location, roof choice and proposed installation scope. Identify the documents and demonstrations you need before comparing quotations.
Request a project review