Do not select a pergola from a generic wind rating alone. Provide the exact site, locally required design criteria, terrain and exposure, elevation, module dimensions, roof type, post layout, wall connections and foundation information. The supplier can then identify a product starting point, while qualified local parties confirm structural suitability, foundations and approval requirements.
Information needed before structural review
Exact location
Country, city and site coordinates where possible, not only a regional market name.
Design criteria
Wind, snow and other loads required by the local engineer or authority.
Exposure
Open coast, rooftop, urban shelter, valley, hillside or surrounding buildings.
Geometry
Every bay's width, projection, height, roof direction and connected-module layout.
Supports
Post positions, wall mounting, shared beams and any requirement for fewer columns.
Foundations
Available slab, footing or supporting structure and who will design the connection.
Catalogue size versus site approval
A maximum single-module reference describes a catalogue selection boundary, not universal approval. The same 4 × 6 m module can behave differently on a sheltered ground-level patio and an exposed rooftop. Connected modules also change load paths, shared supports, drainage and movement.
Use catalogue sizes to shortlist models. Use project drawings and local criteria to verify the actual layout. If the supplier cannot explain this distinction, the quotation may be missing important assumptions.
Questions to send the supplier
| Question | Why it matters |
|---|---|
| Which model and module arrangement are you reviewing? | Prevents a rating for one system being applied to another |
| Which wind, snow and exposure inputs were assumed? | Makes the basis of the recommendation visible |
| Are louvers open, closed or in another position for the stated condition? | Operating assumptions may affect the review |
| Which posts, beams, connections and foundations are included? | Separates product supply from local supporting work |
| What remains for the local engineer or authority? | Clarifies responsibility before order approval |
Snow and water are different checks
Snow loading concerns structural demand and local design criteria. Rain management concerns louver closure, gutters, drainage routes, post outlets and the site discharge. A product described as rain-managing should not automatically be assumed suitable for an unspecified snow condition.
How to read a wind or snow performance report
Ask for the complete document and its drawing reference, not just the largest number on a sales sheet. First identify whether it reports a laboratory test, a project calculation or an operating limit. A motor's permitted operating condition is not the same as the installed structure's design resistance.
Compare the report with the configuration being quoted. A different bay size, post height, fixing arrangement or enclosure can put your project outside its stated scope. If a detail differs, request a written review rather than assuming the result transfers.
| Report item | What to verify |
|---|---|
| Identity and traceability | Issuer, report reference, model, drawing revision and the actual assembly covered. |
| Basis and units | Applicable method or standard, wind-speed definition or pressure, and snow-load units. A speed alone is not a design pressure. |
| Test or calculation conditions | Roof position, open or enclosed sides, dimensions, supports and the components included. |
| Result and limitations | What was assessed, acceptance criteria, exclusions and whether the document applies to your proposed installation. |
Why a snow-load figure is not an allowed snow depth
Snow depth alone does not determine its mass: density and water content matter. A load stated per unit area cannot be converted into a universally safe number of centimetres of snow.
Ask the project engineer to distinguish ground-snow inputs from the roof design case and consider the actual roof geometry and accumulation conditions. Do not invent a snow-clearing threshold from a catalogue claim or operate a loaded roof to shed snow without the applicable product instructions.
Also distinguish strength from movement. A structural review may need to consider deformation where glass, screens or moving roof parts meet the frame. For side enclosures, use the glass and frame interface checklist to coordinate the information from both suppliers.
Reference documents to discuss with your engineer
ASCE 7 and Eurocode 1 are design-reference families. The applicable edition and local provisions must be confirmed for the project; these links do not certify a JY product. For the distinction between snow depth and water content, see NSIDC: snow water equivalent.
Warning signs in a quotation
- A single wind number with no model, module size or operating condition.
- No distinction between overall project size and one structural bay.
- Foundation or wall capacity assumed without site information.
- A rooftop treated the same as a sheltered patio.
- Catalogue dimensions described as approval for every location.
- No written list of engineering assumptions and local responsibilities.
This guide does not provide a wind or snow rating. Final structural design, foundations, connections, permits and installation compliance must be established for the project location by qualified parties.
Send the site criteria with your layout
Include location, dimensions, height, module plan and any wind or snow criteria supplied by the local project team.
