Start from the finished floor, not the unfinished slab
Give the survey and the supplier drawing one shared vertical reference. State whether dimensions start at the structural slab, the top of paving or the final decking surface. A floor finish added later reduces the available height if the beam stays at the same level.
Record levels at each post and along walking routes on a sloping patio. Mark the intended final finish thickness as confirmed or pending. Do not assume that changing post lengths on site is permitted; resolve the height and base connection on the approved drawing.
Request these heights separately
A side section through the house door and pergola is more useful than a front-view photograph alone. Identify what each dimension measures.
| Dimension | What to check |
|---|---|
| Overall height | Top of the fixed frame, plus any separate maximum moving-roof height. |
| Beam underside | Distance from the stated floor level to the underside of the beam. |
| Usable clear height | Lowest beam, screen box, light or other obstruction above the relevant route. |
| Door and window sweep | The space occupied by the actual leaf, handle and closer while opening. |
| Roof movement envelope | Space required throughout rotation or folding, not just at the end position. |
A height calculation that exposes a common mistake
Illustrative example only: a beam underside is 2,600 mm above the existing slab. The new floor build-up is 80 mm, leaving 2,520 mm below that beam. If an accessory projects another 120 mm below it over a passage, local clearance becomes 2,400 mm: 2,600 − 80 − 120.
These invented dimensions explain the calculation; they are not JY specifications or a recommended minimum. Check every relevant position. An accessory beside a walkway may not reduce that walkway's clearance, while one directly above it does.
Check rotating and folding roofs differently
JY160, JY180, JY220 and JY250 use rotating louvers. Check the blade and mechanism envelope throughout their permitted movement, especially below eaves or near opening upper-floor windows. A closed-roof elevation alone cannot establish the required clearance.
JY280 uses a retractable folding roof. Include both the travelling panels and the parked stack in plan and section. Use the roof opening and stacking guide to coordinate the open-sky area. Do not transfer a rotating-louver clearance to JY280.
What to send for a height review
Send the site location, footprint, required clear height, finished floor levels and a side photograph with a scale reference. Mark eaves, gutters, door swings, windows and proposed ZIP screens, glass, fans or heaters. Obtain the selected accessory's installation requirements rather than assigning a generic clearance.
Ask the supplier to return a dimensioned section and list unresolved measurements before production. Compare pergola systems alongside the installation preparation checklist. Keep building-height restrictions and local approval requirements separate from the product dimensions.
Technical reference
Renson's Aero technical sheet distinguishes closed-roof and open-blade height. Its dimensions apply to that product, not JY systems.
Buyer questions
Is 2.5 m enough for a pergola?
A height alone is insufficient. Confirm where it is measured, the final floor level, obstructions and moving parts. The required usable clearance depends on the project and applicable local requirements.
Does the quoted height mean clear height?
Not necessarily. Ask the drawing to identify overall height, beam underside and the minimum clear passage height separately.
Can I add glass or ZIP screens after deciding the height?
Only after checking their headboxes or tracks, mounting interfaces and opening dimensions. Allow for these components before approving the frame; later additions are not automatically compatible.
This guide explains dimensional coordination. It does not set a universal legal minimum height, roof clearance or approved post-cutting method.
Confirm the height before ordering
Send a side-view photo, final floor levels and the clearance you want. Include planned screens or glass so the frame and accessories can be reviewed together.
Request a project review